As wind energy experts from the very beginning, we have decades of practical experience. Our specialists have developed methods that are used for the site suitability of wind turbines.
Our experienced employees regularly take part in meetings of the International Electrotechnical Commission (IEC). We consult and support well-known utility companies, international wind turbine manufacturers, medium-sized wind farm operators and private individuals alike. Our expertise results from more than 1,000 projects per year.
Our reports fully fulfil the requirements of the relevant guidelines. In Germany, the guidelines for wind turbines issued by the German Institute for Building Technology (DIBt) currently apply.
Neighbouring wind turbines influence the turbulence of each site, so these must be investigated. For typical coastal sites, this applies if the distance to the neighbouring wind turbine is five or less rotor diameters. For typical inland locations, if the distance is eight or less rotor diameters. Other wind conditions, including extreme wind events, must also be taken into account.
How is the wind farm configured? What wind conditions prevail at the site? In a site suitability report, the existing type approval for each wind turbine is compared with the specific conditions at its individual site.
With wake2e you can check and calculate every wind turbine location in wind farms.
We use our expertise to prepare calculations and expert reports for every planning step.
Yes, the site suitability report is required to obtain planning permission. It is, so to speak, a legal component of a building permit. Under German law, the site suitability of a wind turbine as stated by the manufacturer must be checked by an independent expert and confirmed in a legally binding manner.
The client shall provide the necessary documents in writing or preferably electronically. Necessary input data are
According to DIBt guidelines from 2012, a site survey is required to prove the site suitability of a wind turbine.
During this type of site survey, all potentially relevant structures are recorded and documented in a report. Potentially relevant structures are, for example, buildings, quarries, forest edges or other structures of a certain size that trigger turbulence that may influence the wind turbines to be considered.
Anyone who is sufficiently trained and can document the site survey in a legally binding report.
There are several options for implementation:
We will be happy to send you the requirements for the documentation of a site survey.